After lying the first stone 15 months ago, the new OPTIMAL logistic center is going to be operational within the next weeks.
The new full automatically warehouse system is built at the newest high tech standards. As an example: the small containers are moving automatically with a speed of 6 meter per second from their stock location to the packing area.
The complete plant has a capacity of 90.000 container and 5.000 pallet places. With the new installation OPTIMAL anticipates to the ongoing, growing need for OPTIMAL products.
